Replacement of STCD VENT Pipe
Required devices¶
No. |
Parts name |
Category |
Required number |
Note |
---|---|---|---|---|
① |
STCD VENT Pipe (MF-MF) |
1 |
||
② |
10×12 Spanner |
2 |
Procedures¶
Step 1¶
On the instrument monitor or workstation, check that the temperature of the column oven is lower than 40 °C, and check that the temperatures of the injection port and detector are 50 °C or lower. After checking the temperatures, turn OFF the main power to the instrument.
Step 2¶
Open INJ/DET cover to remove it.
Step 3¶
Open AFC/APC cover to remove it.
Step 4¶
Remove the VENT pipe from the STCD unit using two 10×12 spanners.
Step 5¶
Remove the VENT pipe from the VENT buffer unit using two 10×12 spanners.
Step 6¶
Install a new VENT pipe to the VENT buffer unit and tighten the nut using two 10×12 spanners.
Step 7¶
Bend the VENT pipe to pass it through the slit.
Step 8¶
Install a new VENT pipe to the STCD unit, and tighten the nut using two 10×12 spanners.
Step 9¶
Close INJ/DET cover.