Sample Injection Port SPL-2025

Replacing the Septum


 

Tools Required

Tweezers

Procedure


1

Press the [SYSTEM] key on the GC unit and select "INJ Maintenance" in the PF menu.

The temperature of the sample injection port and the column oven will lower automatically, and the supply of carrier gas will stop when it goes below 50 deg.C.

 

2

Check that the message "Perform INJ maintenance" appears on the GC display.

 

3

Loosen and remove the septum nut.

 

4

Remove the needle guide.

 

5

Remove the septum.

Reference: Septum Types

 

 

6

Replace the septum.

 

7

Put back the needle guide.

 

8

Tighten the septum nut fully, and then loosen it half a turn.

 

9

(Press the [SYSTEM] key) Select "Analysis" in the PF menu. The GC will be readied automatically.

 

10

Select "3. Analysis Counter" on the screen in which the [DIAG] key is pressed. Place the cursor on "Counter for Septum" and select "Reset" in the PF menu to reset the analysis count.

 

Maintenance Top ; GC-2025 Main ; GC-2025 Detector ; GC-2025 Sample Injection Port ; GC-2025 Column Oven